AMC 22.152  Winch-launching and auto-tow launching

CAA ORS9 Decision No. 1

For showing compliance with the winch-launching requirements at least 6 winch-launches should be made, covering the range of speeds up to VW. During these launches a range of release points should be selected along the flight path to cover the normal operating range and the release in emergency.