AMC 21.A.115 Requirements for the approval of major changes in the form of a supplemental type certificate (STC)
CAA ORS9 Decision No. 1
(a) For STCs approved by the CAA, the AMC and GM to point 21.A.20 should be followed by the applicant.
(b) For an application under point 21.A.115(c), see GM 21.A.21(b), 21.A.95(c), 21.A.97(c), 21.A.115(c), 21.B.103(b), 21.B.107(b) and 21.B.111(b).
(c) In accordance with point 21.A.115(d), the compliance demonstration process must always cover the specific configuration(s) in the type certificate (TC) to which the STC under approval is applied. These configurations should be defined by the change to the type certificate considering the type certificate data sheet (TCDS) and the relevant optional installations. The demonstration of compliance should cover these specific applicable configurations. Consequently, the approval of the STC excludes any other configurations, in particular those that already existed, but were not considered in the compliance demonstration process, and those that may be certified in future.
(d) For STCs approved by the design organisation approval (DOA) holder under their privilege as per point 21.A.263(c)(9), the process described under AMC No 2 to 21.A.263(c)(5), (8) and (9) applies.