GM No 1 to 21.A.126(a)(3) Production inspection system – List of specifications    

CAA ORS9 Decision No. 1

It is the responsibility of:

1. The designer, to define all necessary processes, techniques and methods to be followed during manufacture (21.A.31) and this information will be provided as part of the applicable design data.

2. The manufacturer, to ensure that all processes are carried out strictly in accordance with the specifications provided as part of the applicable design data.