Article 7a Operational suitability data

1. The holder of an aircraft type-certificate issued before 17 February 2014 intending to deliver a new aircraft to an EU operator or a UK operator on or after 17 February 2014 shall obtain approval in accordance with point 21.A.21(e) of Annex I (Part 21) except for the minimum syllabus of maintenance certifying staff type rating training and except for aircraft validation source data to support the objective qualification of simulator(s). The approval shall be obtained not later than 18 December 2015 or before the aircraft is operated by an EU operator or a UK operator , whichever is the latest. The operational suitability data may be limited to the model which is delivered.

2. The applicant for an aircraft type-certificate for which the application was filed before 17 February 2014 and for which a type-certificate is not issued before 17 February 2014 shall obtain approval in accordance with point 21.A.21(e) of Annex I (Part 21) except for the minimum syllabus of maintenance certifying staff type rating training and for aircraft validation source data to support the objective qualification of simulator(s). The approval shall be obtained not later than 18 December 2015 or before the aircraft is operated by an EU operator or a UK operator , whichever is the latest. Compliance findings made by the authorities in Operational Evaluation Board processes conducted under the responsibility of the JAA or the Agency before the entry into force of this Regulation shall be accepted by the CAA without further verification.

3. Operational Evaluation Board reports and master minimum equipment lists issued in accordance with JAA procedures or by the Agency before the entry into force of this Regulation shall be deemed to constitute the operational suitability data approved in accordance with point 21.A.21(e) of Annex I (Part 21) and shall be included in the relevant type-certificate. Before 18 June 2014 the relevant type-certificate holders shall propose the Agency a division of the operational suitability data in mandatory data and non-mandatory data.

4. Holders of a type-certificate including operational suitability data shall be required to obtain approval of an extension of the scope of their design organisation approval or procedures alternative to design organisation approval, as applicable, to include operational suitability aspects before 18 December 2015.