AMC1 SPA.RVSM.105 RVSM operational approval
CAA ORS9 Decision No. 1
CONTENT OF OPERATOR RVSM APPLICATION
The following material should be made available to the CAA, in sufficient time to permit evaluation, before the intended start of RVSM operations:
(a) Airworthiness documents
Documentation that shows that the aircraft has RVSM airworthiness approval. This should include an aircraft flight manual (AFM) amendment or supplement.
(b) Description of aircraft equipment
A description of the aircraft appropriate to operations in an RVSM environment.
(c) Training programmes, operating practices and procedures
The operator should submit training syllabi for initial and recurrent training programmes together with other relevant material. The material should show that the operating practices, procedures and training items, related to RVSM operations in airspace that requires State operational approval, are incorporated.
(d) Manuals and checklists
The appropriate manuals and checklists should be revised to include information/guidance on standard operating procedures. Manuals should contain a statement of the airspeeds, altitudes and weights considered in RVSM aircraft approval, including identification of any operating limitations or conditions established for that aircraft type. Manuals and checklists may need to be submitted for review by the CAA as part of the application process.
(e) Past performance
Relevant operating history, where available, should be included in the application. The applicant should show that any required changes have been made in training, operating or maintenance practices to improve poor height-keeping performance.
(f) Minimum equipment list
Where applicable, a minimum equipment list (MEL), adapted from the master minimum equipment list (MMEL), should include items pertinent to operating in RVSM airspace.
(g) Plan for participation in verification/monitoring programmes
The operator should establish a plan for participation in any applicable verification/monitoring programme acceptable to the CAA. This plan should include, as a minimum, a check on a sample of the operator's fleet by an regional monitoring agency (RMA)’s independent height-monitoring system.
(h) Continuing airworthiness
Aircraft maintenance programme and continuing airworthiness procedures in support of the RVSM operations.