GM1 ORO.FC.232 EBT programme assessment and training topics
CAA ORS9 Decision No. 32
TABLE OF ASSESSMENT AND TRAINING TOPICS
(a) The assessment and training topics usually have several example scenario elements. At least one example scenario element is selected (e.g. Gen 4 topic ‘Go-around’ in MT has three example scenario elements — the operator may choose one at each module (frequency A)).
(b) Flight phase for activation:
Abbreviation | Flight phase | Description |
---|---|---|
GND (1) | Flight planning, preflight, engine start & taxi-out Taxi-in, engine shutdown, post-flight & flight closing |
Ground phases up to when the crew increases thrust for taking-off From the speed that permits the aircraft to be manoeuvred by means of taxiing for arriving at a parking area until the crew completes post-flight and flight closing duties. |
TO (2) | Take-off | This phase begins when the crew increases the thrust for taking-off. It ends after the speed and configuration are established at a defined manoeuvring altitude or to continue the climb for cruise. |
CLB (3) | Climb | This phase begins when the crew establishes the aircraft at a defined speed and configuration enabling the aircraft to increase altitude for the purpose of cruise. It ends with the aircraft established at a predetermined constant initial cruise altitude at a defined speed. |
CRZ (4) | Cruise | The cruise phase begins when the crew establishes the aircraft at a defined speed and predetermined constant initial cruise altitude and proceeds in the direction of a destination. It ends with the beginning of descent for an approach. |
DES (5) | Descent | This phase begins when the crew departs the cruise altitude for an approach at a particular destination. It ends when the crew initiates changes in aircraft configuration and/or speed to facilitate a landing on a particular runway. |
APP (6) | Approach | This phase begins when the crew initiates changes in aircraft configuration and/or speeds enabling the aircraft to manoeuvre for landing on a particular runway. It ends when the aircraft is in the landing configuration and the crew is dedicated to land on a specific runway. It also includes go-around where the crew aborts the descent to the planned landing runway during the approach phase. Go-around ends after speed and configuration are established at a defined manoeuvring altitude or to continue the climb for cruise. |
LDG (7) | Landing | This phase begins when the aircraft is in the landing configuration and the crew is dedicated to touchdown on a specific runway. It ends when the speed permits the aircraft to be manoeuvred by means of taxiing for arrival at a parking area. |
ALL (8) | All | Any or all phases of flight |