GM2 CAT.POL.A.320 En-route – single-engined aeroplanes
CAA ORS9 Decision No. 1
RISK PERIOD
In the context of commercial air transport operations with single-engined turbine aeroplanes in instrument meteorological conditions or at night (CAT SET-IMC), a risk period is a period of flight during which no landing site has been selected by the operator.